Skip to content
UK SRSThe UK Sustainability Reporting Standards, ESOS, SECR and TCFD, read against the published text.HUBUK SRS GuideAn independent reference guide to UK SRS, ESG, TCFD, SECR, ESOS and the global standards.YOU ARE HEREGlobal Reporting StandardsSustainability reporting standards worldwide: ISSB, the EU CSRD after Omnibus I, California SB 253 and SB 261, and UK SRS.UK SRS StandardsUK SRS S1 and S2 at the provision: reliefs, comply or explain, and the FCA statements.ESOS QuestESOS Phase 4 in depth: qualification, the audit, sign-off, action plans and penalties, read against the Regulations.SRS EngineeringThe data build behind a UK SRS report: metrics, owners, controls and timing.SRS ReportWhat a UK SRS report contains, how it is assembled, and how to read one.UK SRS ReportAnalysis and commentary: CDP, the DESNZ emission factors, SECR and ESOS, with every figure cited.UK SRS NewsThe cluster's news publication, and what a UK SRS report contains.UK SRS DeliveryTemplates, costs, ESOS delivery guides and readiness assessment.UK SRS FinanceFinanced emissions, PCAF and IFRS S1/S2 for banks, insurers and asset managers.SECRStreamlined Energy and Carbon Reporting: deadlines, thresholds, eligibility and guidance.Carbon CreditsCarbon credit ratings, risk analysis, valuation and market structure.Environmental RegimesThe eight UK environmental reporting regimes, their thresholds, deadlines and regulators.UK SRS ServicesThe services arm: ESOS, SECR, net zero and sustainability consultancy.

Net zero management software · targets, plans and claims

Net zero management software

Net zero management software tracks a company’s emissions against its target and manages the plan meant to get there.

Net zero is not one standard, so this page reads the software job against each one that gives the phrase a meaning.

It ranks nothing and has tested no product.

Status, stated exactly

What "net zero" means, depending on the standard

Four uses of the phrase, none of them a UK legal duty for companies.

Which net zero?Requirements and evidence

Module 01 / 04

SBTi: voluntary

Near-term and net-zero targets, validated by SBTi Services.

Read the detailed guidance and evidence

A PPN 006 carbon reduction plan must confirm a commitment to net zero by 2050 in the UK (PPN 006 Technical Standard).

No UK entity is under a legal duty to have, implement or publish a climate transition plan (UK SRS S2).

Targets

Net zero targets in a management tool

Coverage, base year and gross progress.

TargetRequirements and evidence

Module 01 / 04

Coverage

At least 95% of Scope 1 and 2 for an SBTi near-term target.

Read the detailed guidance and evidence

An SBTi near-term target must cover at least 95% of Scope 1 and 2 and include Scope 3 where relevant Scope 3 is 40% or more of the total (SBTi criteria).

The SBTi’s own target-setting tool is a free spreadsheet (SBTi).

Transition plans

Net zero reporting software and the transition plan

UK SRS S2 asks about any plan; the listing rules carry a statement.

Transition planRequirements and evidence

Module 01 / 04

¶14(a)(iv)

Key assumptions and dependencies of any plan.

Read the detailed guidance and evidence

The listing rules for UKLR 6, 16 and 22 carry a transition-plan statement; UKLR 14 stops at assurance (PS26/19).

The government consulted on transition plan requirements in 2025 and had published no outcome by October 2026 (DESNZ).

The TPT’s disclosure material is archived guidance hosted by the IFRS Foundation (IFRS Foundation).

Claims

Net zero, carbon neutral and the claims a tool can support

PAS 2060 is withdrawn; ISO 14068 needs reductions every cycle.

ClaimsRequirements and evidence

Module 01 / 04

PAS 2060

Withdrawn; verification stopped 1 January 2025.

Read the detailed guidance and evidence

ISO 14068:2026 is the current carbon neutrality standard (ISO).

UKAS notes that under ISO 14068 evidence of a reduction is needed in every reporting cycle (UKAS).

Progress

Measuring progress honestly

Gross emissions against the base year, with method changes recalculated.

ProgressRequirements and evidence

Module 01 / 04

Base year

Fixed, recalculated if the method changes.

Read the detailed guidance and evidence

UK SRS S2 requires gross emissions, so credits are never deducted from the inventory (UK SRS S2 ¶29(a)).

UK reports use the DESNZ conversion factors for each reporting year (DESNZ).

Questions buyers ask

Business net zero software: what to ask

Test the target, the plan and the claim separately.

AskRequirements and evidence

Module 01 / 04

Target

Does the tool apply the right criteria version?

Read the detailed guidance and evidence

No net zero software is approved by the SBTi, the government or ISO; test each claim it makes against the owner’s own criteria.

What this page does not say

The limits of this guide

Requirements and tests, not products.

Scope of this pageRequirements and evidence

Module 01 / 04

No ranking

No vendor is scored.

Read the detailed guidance and evidence

This site is an independent reference and takes no commission from any vendor.

Frequently asked

Questions people ask

What is net zero management software?

Software that tracks emissions against a net zero or science-based target and manages the actions, owners and assumptions in the transition plan.

Is net zero reporting mandatory in the UK?

No UK entity has a legal duty to have or publish a transition plan.

Listed companies under UK SRS say something about any plan they have, and PPN 006 suppliers commit to net zero by 2050.

Do carbon credits count toward net zero progress?

Not as reductions.

Under the SBTi criteria credits never count toward a target, and UK SRS S2 reports gross emissions.

Is PAS 2060 still available?

No. It is withdrawn, and ISO 14068:2026 is the current carbon neutrality standard.

Prepare the evidence

Net zero management software: from a requirement to a reporting pack

Use this preparation sequence alongside the detailed requirements on this page.

An editorial workflow, not a statutory schedule.

  1. Stage 0101

    Reporting specification

    Write the reporting boundaries and required outputs before evaluating a platform.

  2. Stage 0202

    Evidence sample

    Ask the vendor to demonstrate a representative import and calculation.

  3. Stage 0303

    Method control

    Inspect factor versions, estimates, permissions and change history.

  4. Stage 0404

    Reporting export

    Test the export against the required disclosures and existing reporting systems.

  5. Stage 0505

    Review trail

    Check whether a reviewer can follow a result back to its source record.

  6. Stage 0606

    Commercial record

    Record only the features, scope and prices the vendor actually commits to.

Read the applicable instrument: Near-term criteria

A practical brief

An evidence pack, with a clear review trail

Ask for a pack that lets the next reviewer retrace the scope decision, follow the evidence and understand the limitations.

This describes a useful handover; it does not certify compliance or establish that a vendor or adviser delivers it.

Trace the answerScope → evidence → review

Module 01 / 04

Applicability record

Write down the entity, reporting route and relevant period, including why the route applies.

View the preparation diagramNet zero management software: evidence preparation sequenceNet zero management software: evidence preparation sequence
  1. Prepare01

    Create the traceable pack

    Keep the input records, calculation files and narrative together.

  2. Challenge02

    Resolve questions before publication

    Record the assumptions challenged and any limitations still unresolved.

  3. Retain03

    Make the next cycle reproducible

    Keep the approved version and the actions carried forward.

Sources

Primary sources

Every figure, date and status on this page traces to the instrument’s owner.

Secondary commentary is never the source for a number.

Book a free consultation