Skip to content
UK SRSThe UK Sustainability Reporting Standards, ESOS, SECR and TCFD, read against the published text.HUBUK SRS GuideAn independent reference guide to UK SRS, ESG, TCFD, SECR, ESOS and the global standards.YOU ARE HEREGlobal Reporting StandardsSustainability reporting standards worldwide: ISSB, the EU CSRD after Omnibus I, California SB 253 and SB 261, and UK SRS.UK SRS StandardsUK SRS S1 and S2 at the provision: reliefs, comply or explain, and the FCA statements.ESOS QuestESOS Phase 4 in depth: qualification, the audit, sign-off, action plans and penalties, read against the Regulations.SRS EngineeringThe data build behind a UK SRS report: metrics, owners, controls and timing.SRS ReportWhat a UK SRS report contains, how it is assembled, and how to read one.UK SRS ReportAnalysis and commentary: CDP, the DESNZ emission factors, SECR and ESOS, with every figure cited.UK SRS NewsThe cluster's news publication, and what a UK SRS report contains.UK SRS DeliveryTemplates, costs, ESOS delivery guides and readiness assessment.UK SRS FinanceFinanced emissions, PCAF and IFRS S1/S2 for banks, insurers and asset managers.SECRStreamlined Energy and Carbon Reporting: deadlines, thresholds, eligibility and guidance.Carbon CreditsCarbon credit ratings, risk analysis, valuation and market structure.Environmental RegimesThe eight UK environmental reporting regimes, their thresholds, deadlines and regulators.UK SRS ServicesThe services arm: ESOS, SECR, net zero and sustainability consultancy.

Standards and reporting

Climate Change Agreements

A Climate Change Agreement is a voluntary target-based scheme connected to reduced Climate Change Levy rates, with its own eligibility, performance and administration rules (reduced-rate mechanism; 2026 guidance).

What decision does a CCA answer?

The scheme exchanges energy or carbon target commitments for a route to reduced CCL rates; it is not a general sustainability-reporting certificate scheme purpose legal mechanism.

What decision does a CCA answerRequirements and evidence

Module 01 / 04

Facility

Identify the eligible operation.

Read the detailed guidance and evidence

In our fictional case, Moorbank Food Processing is considering a CCA for an eligible production operation while separately running an office and distribution activity.

The finance director wants to know whether the available relief justifies the work needed to establish a sound boundary, report performance and manage the agreement.

That business decision requires a facility-specific brief, rather than assuming that every activity becomes covered because it shares a company name.

The Climate Change Levy guide explains supply-tax treatment, while the standards homepage distinguishes the agreement from corporate reporting frameworks.

The new-scheme government response explains the voluntary incentive structure and the longer-term policy decision, rather than replacing the operative rules government response.

What should Moorbank decide before applying?

Frame participation as a facility-specific operating and financial decision before preparing an application.

The proposal needs a supported activity boundary and realistic delivery responsibilities, not just an assumed relief percentage.
DecisionEvidence to examineUseful review question
OperationActual process and site descriptionWhich activity is being put forward?
BoundaryEligible installation and other usesWhich energy belongs inside the facility?
ResponsibilityOperations and finance capacityWho can deliver the performance evidence?
Commercial caseRelief assumptions and participation workWhich unresolved dependency affects the decision?
Read the detailed guidance and evidence

The fictional proposal presents relief as a conditional scheme benefit rather than a saving already earned.

Moorbank records which questions need an administrator or specialist response before its board accepts the participation case.

How should eligibility be investigated?

The facility rules include a 70% reckonable-energy condition alongside the relevant installation and process tests eligible facility rule.

How should eligibility be investigatedRequirements and evidence

Module 01 / 04

Process

Match the actual eligible activity.

Read the detailed guidance and evidence

Eligibility cannot be established by calling Moorbank energy intensive or by quoting an arbitrary energy-cost percentage.

Regulation 3 sets a condition that at least 70% of the relevant reckonable energy is intended for use in the specified installation or installations Regulation 3.

The operations manager therefore draws the production boundary and distinguishes shared services from the office and distribution activities before finance estimates relief.

The current administration guidance should be read alongside the legislation when identifying the relevant route and evidence statutory guidance managing participation.

This worked case does not determine the eligibility of any real food-processing activity or substitute a fictional process description for the scheme’s listed requirements.

Which eligibility questions need evidence?

Test the process, reckonable-energy boundary and shared services together before accepting eligibility.

A sound eligibility explanation identifies the actual operation and the evidence behind its proposed facility boundary.
DecisionEvidence to examineUseful review question
Process matchOperating description against applicable categoriesIs the proposed activity actually eligible?
Energy boundarySupply and use mapHow is reckonable energy attributed?
Shared servicesAllocation explanation and source recordsCould excluded use distort the facility picture?
Review outcomeReasoned eligibility conclusionWhat remains unresolved before participation?
Read the detailed guidance and evidence

Moorbank attaches its boundary drawing to the eligibility discussion so that the scheme lead and engineer are discussing the same operation.

An invoice total alone cannot explain how energy is distributed across several processes.

Which target periods apply to the new scheme?

The amended administration rules define TP7, TP8 and TP9, while the 2026 guidance describes administration through 31 March 2033 target-period amendment administration period.

Which target periods apply to the new Requirements and evidence

Module 01 / 04

Baseline

Identify the scheme comparison basis.

Read the detailed guidance and evidence

TP7 runs from 1 January to 31 December 2026, TP8 covers 2027–2028 and TP9 covers 2029–2030 defined target periods.

The statutory guidance places the new scheme’s three target periods against a 2022 base year and describes administration through 31 March 2033 baseline and administration.

Moorbank’s editorial calendar therefore separates the performance period, the evidence-review work and the period relevant to relief rather than using one field labelled CCA deadline.

The operational guidance is the place to confirm management tasks and reporting instructions for the actual agreement agreement management.

How should the calendar separate different clocks?

Keep baseline, performance, reporting and relief periods visible as separate calendar concepts.

The scheme’s administrative duration does not replace the instructions applying to each intermediate task.
DecisionEvidence to examineUseful review question
BaselineAgreed comparison data and basisWhich starting point supports the target?
PerformanceApplicable target-period datesWhich operating data belongs in this period?
ReportingCurrent agreement instructionsWhen and how is evidence supplied?
ReliefCertificate and covered supply periodDoes the supply fall inside coverage?
Read the detailed guidance and evidence

The fictional project manager identifies the applicable instruction before entering a date into the shared calendar.

The presence of a later administrative end date does not justify treating every intermediate reporting task as optional.

What performance evidence is useful?

Agreement management requires the team to connect actual performance with the relevant target and scheme instructions operational guidance.

What performance evidence is usefulRequirements and evidence

Module 01 / 04

Inputs

Retain energy and production evidence.

Read the detailed guidance and evidence

Moorbank’s named fictional trial concerns a revised cleaning schedule that changes both production downtime and hot-water demand.

The engineer retains energy readings, production records and the change date, then explains whether the comparison remains meaningful when the product mix changes.

This is an original evidence-design example, not a claim that the scheme prescribes that exact metric or that a cleaning change necessarily saves energy.

The scheme lead checks the actual agreement before converting the operational observation into a target-performance statement.

The ISO 50001 guide provides a separate management-system context for energy review, without making ISO certification a substitute for CCA requirements.

What would a performance review ask?

Compare operating evidence with the actual target basis before turning a trial result into a scheme statement.

The review tests whether Moorbank can explain both the calculation and the operational changes behind it.
DecisionEvidence to examineUseful review question
Source dataEnergy and operational recordsCan the reported input be traced?
Target basisAgreement and applicable methodIs performance judged against the correct commitment?
ChangeCleaning trial and product-mix chronologyDoes the comparison need explanation?
ConclusionDraft result and outstanding questionsCan the reviewer understand uncertainty?
Read the detailed guidance and evidence

Moorbank keeps an unsuccessful trial in its evidence history rather than deleting it to improve the appearance of the programme.

That record supports a better operating decision even where the trial does not produce the expected result.

How are buy-out and CCL relief different?

The buy-out provisions concern scheme performance and certification, while the CCL reduced-rate mechanism concerns covered supplies Regulation 12 paragraph 44.

How are buy-out and CCL relief differeRequirements and evidence

Module 01 / 04

Result

Determine the relevant performance position.

Read the detailed guidance and evidence

From TP7, Regulation 12 uses a buy-out formula rather than a single timeless historical amount current formula.

The formula refers to the relevant levy-rate inputs, making it unsafe to copy an old per-tonne number into a new-period budget formula components.

HMRC separately lists the commodity-specific CCA percentage discounts, including electricity at 92% and gas at 89% in the current table discount table.

Moorbank’s finance model therefore has separate schedules for expected levy treatment, performance uncertainty and any applicable buy-out calculation.

The board can then see which assumption depends on participation, which depends on performance and which is simply a dated rate input.

Which budget assumptions must remain separate?

Separate the main levy, covered reduced rate, performance forecast and buy-out calculation in the budget.

These are different assumptions: a change in one should not silently rewrite the others.
DecisionEvidence to examineUseful review question
Main levyApplicable commodity rateWhat would the supply treatment be without this relief?
Reduced rateCovered supply and current discountIs the assumed coverage evidenced?
PerformanceTarget result and uncertaintyWhat operational result is being forecast?
Buy-outApplicable period and formula inputsHas an obsolete fixed figure been reused?
Read the detailed guidance and evidence

The fictional budget does not net all energy-related amounts into a single unexplained saving line.

This makes a change in scheme performance distinguishable from a change in the supplier’s energy tariff.

What changes from January 2027?

SI 2026/826 has a future commencement date and changes specified process and formula provisions made 2026 amendment.

What changes from January 2027Requirements and evidence

Module 01 / 04

Commencement

Keep the future start visible.

Read the detailed guidance and evidence

The instrument comes into force on 1 January 2027 and adds specified processes including mechanical recycling of plastic, spirits packaging and automotive-grade battery-cell production commencement and Schedule.

It also changes the gas factor used in the buy-out formula, which is distinct from the gas percentage discount on the HMRC rates page Regulation 7 CCL discounts.

The policy paper explains the extension and amendment rationale, but the made instrument supplies the commencement and legal wording policy explanation made rules.

Moorbank’s fictional preparation note labels the change future and does not use it to rewrite the current facility decision.

An organisation considering a newly listed process should resolve the actual eligibility and administration steps rather than assume publication alone creates relief.

How should a future-change note be reviewed?

Read the made amendment and its commencement before relying on a newly listed process or formula change.

A future-change note identifies the exact working assumption to revisit and the dependency that remains unresolved.
DecisionEvidence to examineUseful review question
SourceMade instrument and explanatory policyWhich document establishes the operative wording?
DateExpress commencement provisionIs the change current or future?
EffectSpecific process or formula amendmentWhich working assumption actually changes?
DependencyEligibility and administration reviewWhat must happen before relief is relied on?
Read the detailed guidance and evidence

The fictional change note identifies the affected assumption and the person who will review it before the new period.

It does not advertise a new process as already covered while the relevant provision remains future.

How should CCA work be commissioned?

A useful engagement follows the scheme’s eligibility, target and management tasks rather than promising a universal energy-compliance outcome scheme administration ongoing management.

How should CCA work be commissionedRequirements and evidence

Module 01 / 04

Scope

Name the facility and period.

Read the detailed guidance and evidence

Moorbank asks an adviser for a reasoned boundary assessment, a target-evidence handover and a clear list of unresolved administrator questions.

It asks a software supplier to reproduce the performance calculation after one corrected meter input and one explained production change.

The software RFP can structure that demonstration, while ESOS consultants address a different assessment engagement.

CCA participation does not establish completion of ESOS or SECR, which need separate applicability and output checks.

The final fictional handover leaves Moorbank with a supported participation decision and usable performance evidence, rather than a claim that joining the scheme resolves every energy duty.

How can the team put this into practice?

This nine-step editorial workflow is a suggested sequence for the fictional case, rather than an additional regulatory timetable.

  1. 101

    Frame the decision

    Identify the proposed facility and the reason for considering participation.
  2. 202

    Investigate eligibility

    Compare the actual process and energy boundary with the applicable rules.
  3. 303

    Resolve the boundary

    Explain shared services and keep unsupported allocations visible.
  4. 404

    Confirm the agreement basis

    Identify the relevant target, baseline and instructions.
  5. 505

    Prepare performance evidence

    Connect energy inputs, operational records and changes.
  6. 606

    Review the result

    Challenge the comparison before reporting scheme performance.
  7. 707

    Examine financial effects

    Separate levy treatment, performance uncertainty and buy-out inputs.
  8. 808

    Track future changes

    Label commencement and identify the affected assumption.
  9. 909

    Hand over responsibilities

    Leave named owners for agreement management, evidence and supply treatment.

Frequently asked

Questions people ask

Is a CCA compulsory?

It is a voluntary target-based scheme linked to reduced CCL rates.

Does it replace ESOS?

Do not use CCA participation as evidence that a separate energy-assessment duty has been completed.

What is TP7?

The amended rules define TP7 as 1 January to 31 December 2026.

Does the scheme finish in 2030?

The last target period ends in 2030, while the statutory guidance describes administration through 31 March 2033.

Is buy-out a fixed historic price?

From TP7, Regulation 12 uses a formula that must be read for the relevant period.

Are the new processes already covered in October 2026?

The relevant 2026 amendment commences on 1 January 2027.

Sources

Primary sources

Primary provisions and official owner guidance checked on 26 October 2026; historical and draft resources are labelled in the guide.

Book a free consultation