UK SRSThe UK Sustainability Reporting Standards, ESOS, SECR and TCFD, read against the published text.HUBUK SRS GuideAn independent reference guide to UK SRS, ESG, TCFD, SECR, ESOS and the global standards.YOU ARE HEREGlobal Reporting StandardsSustainability reporting standards worldwide: ISSB, the EU CSRD after Omnibus I, California SB 253 and SB 261, and UK SRS.UK SRS StandardsUK SRS S1 and S2 at the provision: reliefs, comply or explain, and the FCA statements.ESOS QuestESOS Phase 4 in depth: qualification, the audit, sign-off, action plans and penalties, read against the Regulations.SRS EngineeringThe data build behind a UK SRS report: metrics, owners, controls and timing.SRS ReportWhat a UK SRS report contains, how it is assembled, and how to read one.UK SRS ReportAnalysis and commentary: CDP, the DESNZ emission factors, SECR and ESOS, with every figure cited.UK SRS NewsThe cluster's news publication, and what a UK SRS report contains.UK SRS DeliveryTemplates, costs, ESOS delivery guides and readiness assessment.UK SRS FinanceFinanced emissions, PCAF and IFRS S1/S2 for banks, insurers and asset managers.SECRStreamlined Energy and Carbon Reporting: deadlines, thresholds, eligibility and guidance.Carbon CreditsCarbon credit ratings, risk analysis, valuation and market structure.Environmental RegimesThe eight UK environmental reporting regimes, their thresholds, deadlines and regulators.UK SRS ServicesThe services arm: ESOS, SECR, net zero and sustainability consultancy.

Standards and reporting

NABERS UK

NABERS UK is most useful when the office, rating boundary and actual operational energy evidence are clear, with targets kept separate from achieved results.

What does NABERS UK measure?

NABERS UK measures and rates actual in-use energy performance of offices, with a separate Design for Performance route for new developments or major refurbishments programme owner design-route fact sheet.

Measure the officeRequirements and evidence

Module 01 / 04

Asset

Identify the office and its rating purpose.

Read the detailed guidance and evidence

The programme owner distinguishes measured performance from design-based ratings, so an efficient design does not by itself establish the office’s achieved NABERS UK result NABERS UK overview.

The UK scheme’s office focus should not be expanded to every building type merely because the Australian programme offers a wider range of ratings UK administrator scope.

This guide follows fictional Dalesford House through a landlord-and-tenant energy evidence review, without calculating an invented star rating or claiming the building is certified.

The standards homepage keeps operational asset performance separate from corporate reporting and broader building sustainability certification.

Which question belongs to which route?

Identify whether the task is an operational rating or delivery towards a future operational target.

The owner identifies the UK office offerings, while the administrator distinguishes UK scope from the wider Australian programme UK offerings scope distinctions.
DecisionEvidence to examineInterpretation
Existing officeActual in-use energy performancePrepare the relevant evidence with the assessor.
New developmentA target under Design for PerformanceKeep the future target distinct from an achieved result.
Major refurbishmentThe proposed works and relevant routeConfirm the actual scheme and project situation.
Other building typeA request concerning a non-office assetDo not assume UK scope from Australian programme examples.
Read the detailed guidance and evidence

Our editorial routing screen does not replace the current scheme documents or an assessor’s determination of the actual rating scope.

Who administers NABERS UK now?

The programme owner identifies CIBSE as administrator, with CIBSE Certification responsible for day-to-day scheme operations programme governance administrator overview.

Use the current ownerRequirements and evidence

Module 01 / 04

Programme

Check the NABERS owner source.

Read the detailed guidance and evidence

NABERS announced CIBSE’s appointment in April 2024, replacing BRE, and CIBSE issued its own announcement of that transition owner appointment notice administrator announcement.

The November 2020 launch announcement remains useful for the scheme’s origin and measured-energy purpose, but its original administrator description is historical launch announcement.

A source page can contain stale background text alongside current governance information, so the commissioning team should resolve the conflict using the dated appointment notice and current owner description.

This guide does not claim a stakeholder count, a provider accreditation or a current service credential that has not been established from the relevant evidence.

Which rating boundary is the team discussing?

CIBSE identifies Base Buildings, Whole Building and Tenancy ratings in the UK office suite, so the chosen type needs to be explicit rating suite.

Suggested boundary questions rather than a reproduction of licensed rating rules.
DecisionEvidence to examineInterpretation
Base-building questionLandlord-related office operation and the selected scheme boundaryAsk the assessor to establish the actual included energy.
Whole-building questionThe office as represented by that rating typeDo not silently present a partial dataset as complete.
Tenancy questionThe relevant tenant scopeKeep its evidence separate from a landlord-only claim.
Mixed or shared servicesMeters or systems serving more than the assumed office scopeResolve the allocation through the applicable scheme process.
Read the detailed guidance and evidence

A familiar billing arrangement is not automatically the rating boundary, so a landlord invoice should be investigated rather than accepted as the complete energy population.

What does Dalesford’s meter case reveal?

Fictional Dalesford House has a main electricity account, tenant information and a separately billed shared-service supply that the first data request missed.

Reconcile the sourcesRequirements and evidence

Module 01 / 04

Register

Identify physical supplies and meters.

Read the detailed guidance and evidence

The building manager initially sends the main account and assumes that everything needed for the intended rating is included, while the facilities engineer identifies another supply serving shared systems.

Our suggested review connects the meter and account records to the actual building services and asks the assessor which information belongs in the selected rating.

That is an evidence-population issue, not proof that the office has poor energy performance or that a particular star rating will follow.

The ESG data collection guide supports source ownership and missing-data handling, while scheme-specific boundary decisions remain with the relevant rating process.

How should an original arithmetic check be used?

The following invented values illustrate a source reconciliation, not the NABERS rating calculation or its official energy boundary.

All numbers are invented and do not establish a real office’s rating, performance benchmark or official metering treatment.
DecisionEvidence to examineInterpretation
Main account180 MWh recorded in the fictional source fileConfirm the supply, period and evidence.
Additional supply20 MWh on a separate shared-service accountInvestigate its relationship to the selected rating scope.
Collected information180 plus 20 equals 200 MWh before scope decisionsThe sum describes collected records, not an accepted rating input.
Possible overlapA tenant record may refer to energy already in another accountResolve duplication rather than add every file automatically.
Read the detailed guidance and evidence

The useful result is a reconciled evidence population whose included energy can be reviewed under the applicable scheme rather than a premature star estimate.

What makes operational energy evidence usable?

A measured-performance task needs the team to understand where each record came from and what it covers, rather than substitute a design estimate for unavailable operational evidence actual-energy purpose.

Check the recordRequirements and evidence

Module 01 / 04

Period

Identify the dates represented.

Read the detailed guidance and evidence

Dalesford’s manager asks contributors to identify whether a quantity is taken from a bill, a meter record or an estimate, and refers uncertain information to the assessor rather than inventing a complete dataset.

The team also preserves the evidence of a changed supply arrangement so a later comparison is not mistaken for a physical efficiency improvement caused by the building systems.

Our preparation fields are editorial advice and do not introduce a universal data-acceptance threshold, weather adjustment formula or rating validity period.

A sustainability software pilot can demonstrate the supply reconciliation and exception trail without promising to replace the actual scheme assessment.

What should the assessor’s preparation brief make clear?

The parties should agree the scope of the information request before launching a broad collection exercise.

Original editorial briefing fields; use current administrator and assessor guidance for scheme-specific acceptance.
DecisionEvidence to examineInterpretation
Rating purposeThe actual office and type of rating soughtClarify the boundary rather than infer it from ownership.
Energy populationSupplies, meters, shared services and relevant accountsIdentify expected sources and possible overlap.
Operational contextKnown changes relevant to the source recordsKeep interpretation attached to the actual office situation.
Open mattersMissing information and unresolved treatment questionsAssign the next decision rather than hide a gap.
Read the detailed guidance and evidence

A sustainability consultancy engagement can specify evidence coordination while keeping the qualified rating role and conclusion separately identified.

How is a Design for Performance target different from a rating?

CIBSE’s fact sheet describes a target of at least four stars and a process leading to an energy rating after operation, rather than an award based only on the design target Design for Performance fact sheet.

Follow the targetRequirements and evidence

Module 01 / 04

Commitment

Identify the signed project target and scope.

Read the detailed guidance and evidence

A developer’s announcement that it targets a NABERS UK result is therefore a different statement from saying the occupied building has achieved that result.

The launch announcement describes targeting a rating at design stage and verifying performance when occupied, which explains the intended connection across the delivery process scheme launch explanation.

Dalesford’s fictional owner keeps the design aspiration in its project history while making any later operational claim from the actual awarded result and its scope.

This guide does not infer that signing an agreement guarantees the target or that an adviser can sell a particular achieved rating.

Which claim matches the evidence available?

Keep aspirations, analysis and actual outcomes distinguishable to investors and occupiers.

Editorial claim screen informed by the separate target and measured-performance routes design route operational route.
DecisionEvidence to examineInterpretation
Target setThe project’s actual Design for Performance commitmentDescribe the target and project stage.
Model completedA design analysis and its assumptionsDo not present predicted performance as a measured result.
Evidence collectedAn operational data package awaiting assessmentDo not turn upload completion into an awarded rating.
Rating awardedThe actual result and its stated scopeCommunicate the achieved rating accurately.
Read the detailed guidance and evidence

The BREEAM certification guide explains another asset assessment whose targets and completed outcomes also need clear status labels.

How does NABERS UK relate to other sustainability evidence?

An office energy rating is not a complete whole-life carbon assessment or a broad sustainability certification, even where the project uses the same operational records.

Keep outputs distinctRequirements and evidence

Module 01 / 04

Energy rating

Measured performance under the selected office scheme.

Read the detailed guidance and evidence

RICS distinguishes operational energy-related carbon from wider embodied and whole-life carbon, making it important not to call a strong office energy rating a complete asset-carbon result carbon definitions.

BRE describes BREEAM across multiple sustainability categories, while NABERS UK’s owner describes measured office energy, so neither result should be casually substituted for the other BREEAM scope NABERS UK scope.

The embodied-carbon guide addresses the asset’s material-related boundary, and SECR and UK SRS explains why corporate reporting has its own scope and output.

Dalesford gives each recipient the actual evidence requested rather than rely on one rating logo as a universal sustainability answer.

What happens when the rating is used in a portfolio assessment?

GRESB’s 2026 assessment has a separate energy-ratings indicator and recognised-scheme list, which makes the portfolio reporting task distinct from obtaining a rating BC2 scheme list.

GRESB owns its assessment treatment; NABERS and CIBSE own their rating scheme, so the source roles remain separate energy-ratings instructions recognised schemes.
DecisionEvidence to examineInterpretation
Scheme recognitionCheck the relevant GRESB scheme listRecognition is not a new NABERS assessment result.
Asset recordConnect the actual office rating to the assetDo not extend one result to unrelated buildings.
StatusUse the rating actually awarded under the requested conditionsA target is not the same evidence as an achieved rating.
Portfolio treatmentFollow the assessment’s own coverage and evidence instructionsDo not infer a portfolio score from the star level alone.
Read the detailed guidance and evidence

This guide does not promise a GRESB score, treat recognition as legal compliance or import a future assessment edition into the stated 2026 task.

What should the building team retain after the rating work?

The next manager needs the actual rating scope and source context so the result remains understandable after a staff or service-provider change.

Make the result usableRequirements and evidence

Module 01 / 04

Outcome

Keep the actual result and represented office scope.

Read the detailed guidance and evidence

Dalesford’s handover records how the additional supply was resolved, preventing the next manager from returning to the incomplete main-account-only file.

The team also preserves the distinction between the earlier design target and the measured outcome, so later marketing does not mix two different statuses.

Our editorial handover supports continuity without inventing scheme retention periods, mandatory reassessment dates or an unverified provider credential.

How can the team organise the work?

This is an original editorial preparation sequence, not a prescribed conformity checklist or a substitute for the selected assessment method.

  1. 101

    Identify the office

    Confirm the actual asset and intended rating purpose.
  2. 202

    Select the route

    Distinguish operational rating from Design for Performance.
  3. 303

    Confirm the boundary

    Agree the rating type with the appropriate assessor.
  4. 404

    Map sources

    List supplies, meters, accounts and shared services.
  5. 505

    Collect evidence

    Preserve operational quantities and source context.
  6. 606

    Reconcile the file

    Investigate gaps, estimates and duplicate records.
  7. 707

    Complete assessment

    Use the actual scheme process and qualified roles.
  8. 808

    Check communications

    Separate target, prediction and awarded outcome.
  9. 909

    Hand over the result

    Retain scope, evidence and resolved exceptions for the next owner.

Frequently asked

Questions people ask

What does NABERS UK rate?

It rates actual in-use energy performance of offices in the UK.

Who administers the scheme?

The owner identifies CIBSE, with CIBSE Certification responsible for day-to-day operation.

Does BRE still administer NABERS UK?

No, the owner announced CIBSE’s appointment in April 2024, replacing BRE.

Is a design target an achieved rating?

No, Design for Performance targets the later operational outcome rather than awarding it immediately.

Does a rating cover embodied carbon too?

Do not infer that; the scheme concerns office energy performance, while embodied carbon has a separate asset-assessment boundary.

Can a target alone be used as a portfolio energy rating?

Check the portfolio assessment’s actual evidence and status conditions rather than substitute a target for an awarded result.

Sources