Skip to content
UK SRSThe UK Sustainability Reporting Standards, ESOS, SECR and TCFD, read against the published text.HUBUK SRS GuideAn independent reference guide to UK SRS, ESG, TCFD, SECR, ESOS and the global standards.YOU ARE HEREGlobal Reporting StandardsSustainability reporting standards worldwide: ISSB, the EU CSRD after Omnibus I, California SB 253 and SB 261, and UK SRS.UK SRS StandardsUK SRS S1 and S2 at the provision: reliefs, comply or explain, and the FCA statements.ESOS QuestESOS Phase 4 in depth: qualification, the audit, sign-off, action plans and penalties, read against the Regulations.SRS EngineeringThe data build behind a UK SRS report: metrics, owners, controls and timing.SRS ReportWhat a UK SRS report contains, how it is assembled, and how to read one.UK SRS ReportAnalysis and commentary: CDP, the DESNZ emission factors, SECR and ESOS, with every figure cited.UK SRS NewsThe cluster's news publication, and what a UK SRS report contains.UK SRS DeliveryTemplates, costs, ESOS delivery guides and readiness assessment.UK SRS FinanceFinanced emissions, PCAF and IFRS S1/S2 for banks, insurers and asset managers.SECRStreamlined Energy and Carbon Reporting: deadlines, thresholds, eligibility and guidance.Carbon CreditsCarbon credit ratings, risk analysis, valuation and market structure.Environmental RegimesThe eight UK environmental reporting regimes, their thresholds, deadlines and regulators.UK SRS ServicesThe services arm: ESOS, SECR, net zero and sustainability consultancy.

Standards and reporting

SBTi FLAG Targets

SBTi FLAG preparation needs a land-related emissions population, separate target-coverage tests and a no-deforestation commitment with its own scope and dates.

What question does a FLAG target answer?

Separate land-related target accounting from energy reductions and wider nature claims.

Land targetRequirements and evidence

Module 01 / 04

Land emissions

Identify agricultural production and land-use sources

Read the detailed guidance and evidence

SBTi’s Forest, Land and Agriculture guidance addresses land-related climate target setting, and the sector page provides the corresponding FLAG resources FLAG sector resources.

A FLAG target is therefore not a complete biodiversity assessment, a product footprint or an EUDR due-diligence statement, even when some supplier records are useful to more than one exercise.

This guide uses an original fictional food processor, Alderfen Foods, to show why commodity evidence, target coverage and the public commitment need separate review decisions.

Who needs to test FLAG applicability?

Use the designated-sector route and the gross-emissions route as separate questions.

Original editorial preparation record, not a prescribed government form.
Evidence questionRecord to inspectDecision supported
Designated sectorCompare actual business activity with FLAG-C1 sectorsA low emissions share does not remove this route
Other sectorCalculate FLAG share of gross Scope 1, 2 and 3Test Table 1’s 20% or more wording
Existing targetInspect whether FLAG is already coveredPlan the current mandatory-review requirement
SME possibilityApply the tailored-route eligibility testsDo not use a corporate FLAG conclusion alone
Read the detailed guidance and evidence

FLAG-C1 requires targets for companies in the six designated sectors and for other companies with FLAG-related emissions of 20% or more of gross Scope 1, 2 and 3 emissions, using the wording in Table 1 FLAG-C1, Table 1.

The six groups cover forest and paper products, agricultural production, animal-source food production, food and beverage processing, food and staples retailing, and tobacco designated sectors.

Alderfen records its processing activity before testing percentages, because selecting whichever calculation avoids the sector route would answer the wrong applicability question.

Which FLAG documents should the team use?

A published revision project does not replace the current guidance.

Version basisRequirements and evidence

Module 01 / 04

Current

Record FLAG Guidance V1.2 and the effective basis

Read the detailed guidance and evidence

FLAG Guidance V1.2 is the March 2026 document, while the owner’s revision announcement says companies should continue using current guidance during development of the next version version history revision status.

The standards and guidance page separates cross-sector resources from sector-specific resources, and its work plan should be read as a development map rather than a licence to apply an unfinished standard resource selection.

Alderfen’s document index identifies the current FLAG version beside each calculation and retains a separate watch list for future changes, avoiding an unrecorded methodology switch when a new consultation appears.

How can a commodity register support the inventory?

Keep physical activity and accounting choices visible before aggregating them into a target.

Original editorial preparation record, not a prescribed government form.
Evidence questionRecord to inspectDecision supported
Ingredient streamSupplier, commodity, origin and purchase periodIdentify the population needing a method
Accounting lineActivity quantity, factor source and treatmentExplain the emissions calculation
ClassificationFLAG or non-FLAG with the reasonKeep totals from drifting between files
UncertaintyMissing origin, estimated data and next actionAvoid treating an unknown as zero
Read the detailed guidance and evidence

The guidance separates land-related emissions accounting from a company’s energy and industry emissions, so a blended total is insufficient to show the FLAG boundary FLAG-C3 and section 3.

Alderfen accepts a dated ingredient ledger that links purchased quantities to the calculation population and rejects a supplier presentation containing a percentage reduction without a matching period or boundary.

This register is an editorial preparation aid, and it should expose uncertainty rather than suggest that every ingredient has equally precise farm-level data.

Why do coverage denominators matter?

A combined percentage can hide a shortfall in one separately tested population.

Separate testsRequirements and evidence

Module 01 / 04

FLAG Scope 1

Identify the FLAG-related direct emissions population

Read the detailed guidance and evidence

FLAG-C2 requires at least 95% of FLAG-related Scope 1 emissions and at least 67% of FLAG-related Scope 3 emissions to be covered, with FLAG and non-FLAG Scope 3 coverage meeting their respective 67% thresholds independently FLAG-C2.

For companies meeting FLAG-C1 whose gross Scope 3 emissions are 40% or more of the total, FLAG-C2 requires both FLAG and energy or industry Scope 3 targets Scope 3 condition.

These are target-coverage tests rather than universal emissions-reduction percentages, and the distinction should remain visible in any Scope 3 software export.

What does a failed coverage test look like?

Alderfen’s fictional numbers illustrate the decision without prescribing a target trajectory.

Original editorial preparation record, not a prescribed government form.
Evidence questionRecord to inspectDecision supported
FLAG Scope 3 population10,000 tCO2e, with 6,500 covered65% does not reach a 67% test
Non-FLAG Scope 3 population20,000 tCO2e, with 15,000 covered75% does not cure the FLAG shortfall
Pooled presentation21,500 of 30,000 tCO2e shown togetherReject as evidence of two separate tests
Corrective preparationIdentify additional eligible FLAG coverageRecalculate each population independently
Read the detailed guidance and evidence

Alderfen initially presents a pooled coverage percentage above 67%, but its reviewer rejects that presentation because FLAG-C2 requires the FLAG and non-FLAG tests separately independent coverage tests.

The accepted worksheet retains both denominators, a link to the inventory population and an explanation of which additional sources are brought within the target.

No figure in this fictional case establishes Alderfen’s target ambition, and the team must still apply the relevant target-setting method and criteria to that separate question.

How is the no-deforestation commitment different?

Its reach and dates cannot be inferred from a target-coverage percentage.

Commitment scopeRequirements and evidence

Module 01 / 04

Commodities

Identify primary deforestation-linked commodity exposure

Read the detailed guidance and evidence

FLAG-C4 requires a public no-deforestation commitment across primary deforestation-linked commodities with a target date no later than two years after submission and never later than 31 December 2030 FLAG-C4.

The guidance requires publication within twelve months of validation and treats the cutoff date as a different concept from the future target date FLAG-C4 commitment and cutoff.

Alderfen does not limit its commitment register to the 67% selected for its FLAG Scope 3 target, because the commitment has its own coverage and must be reviewed on that basis.

Which date belongs in which record?

A named field prevents a supplier’s historical cutoff from being mistaken for a company’s future objective.

Original editorial preparation record, not a prescribed government form.
Evidence questionRecord to inspectDecision supported
Submission dateReceipt for the actual target submissionAnchor the two-year commitment-date test
Commitment target dateApproved no-deforestation wordingCheck the absolute latest date separately
Cutoff dateLand-conversion policy and supporting explanationKeep historical eligibility separate from future delivery
Publication datePublic policy or commitment locationDemonstrate when the statement became accessible
Read the detailed guidance and evidence

The current guidance recommends a cutoff no later than 2020 and contains further conditions where a later cutoff is used, so copying a convenient supplier date without reviewing FLAG-C4 is unsafe cutoff provisions.

Alderfen’s reviewer rejects a policy containing only “zero deforestation by 2030” because it does not explain the selected cutoff or show the submission-linked date test.

The preparation record links the approved wording, commodity population and public location without claiming that a target commitment itself proves every shipment is legally compliant.

How does FLAG interact with other routes?

Decide the relevant combination instead of treating FLAG as a replacement for all other targets.

Route combinationRequirements and evidence

Module 01 / 04

Corporate

Retain cross-sector target requirements

Read the detailed guidance and evidence

The Corporate Net-Zero Standard states that relevant sector guidance may complement its requirements, while the Sector Resources Summary identifies available and planned resources without replacing the detailed documents scope and sector guidance resource summary.

The SME FAQ makes mandatory FLAG status one of four further tests after the four eligibility gates, so a business in a FLAG sector is not automatically excluded from the SME route questions 6 to 8.

The SME guide and validation guide explain these different decisions, while Alderfen keeps its financial reporting framework in a separate standards register.

What should a FLAG service enquiry contain?

Make the requested review and evidence responsibility clear before commissioning support.

Original editorial preparation record, not a prescribed government form.
Evidence questionRecord to inspectDecision supported
Applicant routeCurrent registration classificationEstablish which service family is available
Target packageCorporate or other accompanying serviceIdentify the FLAG add-on correctly
Preparation workCommodity mapping and calculation deliverablesSeparate adviser outputs from validation
Decision evidenceOfficial result and approved wordingControl what the company may communicate
Read the detailed guidance and evidence

Service Offerings V6.1 treats FLAG as an add-on submitted with another validation service, with one add-on fee covering FLAG and buildings, rather than a standalone FLAG purchase add-on service.

Alderfen’s consultancy brief asks for a reconciled commodity population and separate coverage worksheets, while its official validation request remains an application to SBTi Services.

A useful consultancy comparison therefore evaluates the delivered evidence and handover, not an adviser’s unsupported assurance that validation will succeed.

What happens when an existing target is reviewed?

Use the current review rule and preserve the evidence that explains the change.

Review fileRequirements and evidence

Module 01 / 04

Prior target

Recover the approved wording and scope

Read the detailed guidance and evidence

FLAG-C1 says a company with existing targets that meets FLAG applicability must submit a FLAG target at the latest as part of its mandatory five-year review submission existing target holders.

The current corporate near-term criteria contain the mandatory target-review requirement, which should be read alongside the FLAG-specific provision rather than replaced by a vague annual renewal assumption C26.

Alderfen keeps the earlier approved file and a comparison of changed commodity populations, so a reviewer can distinguish business change from improved data and a newly applicable criterion.

What should a FLAG evidence demonstration show?

Ask a system to preserve the difficult accounting distinctions rather than simply display a land-emissions chart.

Original editorial preparation record, not a prescribed government form.
Evidence questionRecord to inspectDecision supported
Commodity correctionChange one ingredient origin or factor sourceRetain the old calculation and reason
Coverage testRemove one source from the target populationShow FLAG and non-FLAG results separately
Commitment boundarySelect a commodity outside target coverageKeep it visible in the commitment register
ExportDownload populations, methods and approvalsReproduce the calculation outside the interface
Read the detailed guidance and evidence

These demonstration tests are original editorial procurement suggestions rather than additional SBTi validation requirements.

Alderfen rejects an export that collapses FLAG and energy or industry Scope 3 into one unexplained percentage, because it cannot support the decision its reviewer actually needs.

A sustainability software specification should therefore request source identifiers, method versions, population bridges and dated approvals alongside the headline result.

What should be watched without applying it early?

Monitor the next standard while keeping a current submission coherent.

Change watchRequirements and evidence

Module 01 / 04

Owner page

Check the current resource and version notices

Read the detailed guidance and evidence

The FLAG revision announcement describes development of a future standard, and the Corporate Net-Zero Standard V2.0 page provides a separate set of corporate resources rather than silently replacing FLAG V1.2 development process corporate V2.0.

Alderfen records the resource-check date and the reason for retaining its current basis, then schedules a deliberate reassessment when an applicable owner update is published.

How can the team prepare a reviewable evidence file?

This editorial workflow organises preparation without certifying compliance or replacing a statutory process.

  1. 101

    Classify activities

    Record designated-sector applicability before testing gross shares.
  2. 202

    Freeze guidance

    Identify the current FLAG and accompanying corporate versions.
  3. 303

    Map commodities

    Link physical activity, supplier evidence and accounting choices.
  4. 404

    Split the inventory

    Bridge land-related and non-FLAG populations to the total.
  5. 505

    Test coverage

    Calculate the applicable thresholds independently.
  6. 606

    Review commitment

    Check commodity scope, cutoff, target date and publication plan.
  7. 707

    Reconcile the file

    Resolve supplier-period and method differences with named owners.
  8. 808

    Submit the package

    Select the appropriate accompanying service and retain the application.
  9. 909

    Hand over monitoring

    Assign commodity changes, evidence updates and public claims to owners.

Frequently asked

Questions people ask

Who must set FLAG targets?

FLAG-C1 covers the six designated sectors and other companies whose FLAG emissions are 20% or more of gross Scope 1, 2 and 3 emissions.

Can the two Scope 3 coverage tests be pooled?

No, the FLAG and non-FLAG 67% coverage thresholds must each be met independently.

Does 67% mean an emissions-reduction rate?

The cited 67% figure is a coverage threshold rather than a universal reduction rate.

Does FLAG replace EUDR due diligence?

FLAG defines climate target and commitment requirements, which should be kept separate from a product’s EUDR regulatory assessment.

Can a small food company use the SME route?

Possibly, because mandatory FLAG status is one of four further SME tests after all four eligibility gates, and three of those four tests must be met.

Is the next FLAG standard already applicable?

The owner describes the revision as development activity and directs companies to continue under current guidance.

Book a free consultation