SINAI Technologies sells enterprise carbon management software whose distinguishing claim is that it models the money as well as the emissions: marginal abatement cost curves, scenario planning and carbon-price sensitivity sit beside the inventory (sinai.com).
That makes one UK disclosure unusually relevant: the internal carbon price, at UK SRS S2 ¶29(f).
We have not tested SINAI and give it no rating.
In its own words
What SINAI says it does
Module 01 / 04
Parts
Module 02 / 04
Planning
Module 03 / 04
Finance
Module 04 / 04
Data
| Item | As SINAI describes it |
|---|---|
| Parts | Measure, Engage, Report, Reduce |
| Planning | Marginal abatement cost curves; scenario modelling; carbon-price sensitivity |
| Finance | CAPEX, OPEX and NPV beside abatement |
| Data | 100,000+ emission factors; supplier-specific emissions for 4 million+ companies |
| Regulations named | CSRD, CBAM, IFRS/ISSB, CDP, GRI, SEC, California SB 253/261 |
| Price | Not published — Enterprise level · TBD |
Read the detailed guidance and evidence
SINAI describes enterprise carbon management “from audit-grade measurement to profitable decarbonization”, deployed as one platform or as modules inside systems a company already runs.
On sinai.com it organises the product in four parts: Measure (Scope 1–3 accounting, automated data capture, more than 100,000 emission factors, facility-level hotspots); Engage (supplier data, including AI-matched supplier-specific emissions for more than 4 million companies); Report (framework templates, AI-assisted drafting, full data lineage); and Reduce (scenario modelling and marginal abatement cost curves).
On sinaitechnologies.com the same company names three modules: carbon accounting and reporting, a climate transition planner and a climate financial planner that models the costs of mitigation projects.
Its Reduce page describes evaluating projects on abatement alongside CAPEX, OPEX and NPV, and testing them under different carbon-price assumptions.
These are SINAI’s statements about its own product.
Audience
Who SINAI says it is for
Module 01 / 04
Targets
Module 02 / 04
Oversight
Module 03 / 04
Key point 03
Module 04 / 04
Targets · 2
Read the detailed guidance and evidence
SINAI writes for global, multi-site enterprises, and its customer stories come from steel, food and logistics companies with many assets and many reduction projects.
Its pitch is to sustainability and finance teams together: reduction projects compared on cost as well as tonnes, so that a board can see the economics.
That is a different job from producing a SECR section or a UK SRS S2 metric, and a buyer should decide which job is the purchase.
A company whose need is the disclosure alone will find the requirements on UK SRS S2; one planning reductions will find the transition-plan rules on transition plans under UK SRS.
Emissions
Scope 1, 2 and 3: what SINAI claims, and what the UK rules ask
Module 01 / 04
Scope 1
Module 02 / 04
Scope 3
Module 03 / 04
Scope 3 · 2
Module 04 / 04
Method
Read the detailed guidance and evidence
SINAI says it provides granular, audit-grade Scope 1–3 accounting from equipment level upwards, with facility-level insight into hotspots.
The UK SRS S2 tests are the same for every tool: gross emissions under the GHG Protocol Corporate Standard, location-based Scope 2, and all fifteen Scope 3 categories considered with the included ones disclosed (¶29(a); ¶¶B30–B33).
SINAI’s supplier-matching claim — supplier-specific emissions for more than 4 million companies — bears on Scope 3 category 1, purchased goods and services.
Ask how a matched supplier figure is distinguished from a figure the supplier provided, because the method behind each category is part of what UK SRS S2 asks an entity to disclose.
SINAI also names target tracking against the Science Based Targets initiative; SBTi’s own standards and guidance say targets set in 2026 use Corporate Net-Zero Standard Version 1.3.1, with Version 2.0 validation from early 2027 (SBTi).
Internal carbon pricing
The internal carbon price: what UK SRS S2 ¶29(f) asks you to disclose
Module 01 / 04
A fictional two-price decision record
Module 02 / 04
Equipment investment considered on 1 Septemb
Module 03 / 04
Longer-term scenario assessment on 15 Septem
Module 04 / 04
Disclosure
Draft the ¶29(f) disclosure · internal carbon prices
The entity applies an internal carbon price as a shadow price, a theoretical cost used to inform decisions in investment decisions and scenario analysis. It uses a price of £[price] per metric tonne of CO2 equivalent to assess the costs of its greenhouse gas emissions.UK SRS S2 ¶29(f)(i)–(ii) · IFRS S2 ¶29(f)
Illustrative drafting only — the £ figure is yours, not a recommended price.
Nothing you enter leaves your browser.
A fictional two-price decision record
A company may use different internal prices for different decisions; the disclosure should explain whether and how the prices were used rather than presenting one unexplained number.
| Invented decision | Invented price | What the record explains |
|---|---|---|
| Equipment investment considered on 1 September 2026 | £60 per metric tonne CO₂e | A shadow-price sensitivity used when comparing options; identify its actual role in the decision. |
| Longer-term scenario assessment on 15 September 2026 | £90 per metric tonne CO₂e | A different purpose and time horizon; retain the assumption and decision record. |
Both prices and dates are invented examples, not market benchmarks, required prices or tested SINAI output; a company using no internal carbon price answers the whether-and-how question accordingly.
Read the detailed guidance and evidence
Searches for SINAI’s internal carbon pricing module are, underneath, searches about a disclosure rule.
UK SRS S2 ¶29(f) requires an entity to disclose “an explanation of whether and how the entity is applying a carbon price in decision-making (for example, investment decisions, transfer pricing and scenario analysis)”, and “the price for each metric tonne of greenhouse gas emissions the entity uses to assess the costs of its greenhouse gas emissions”.
The wording is the same in IFRS S2 ¶29(f).
Because the first limb asks “whether and how”, a company that applies no internal carbon price still has something to disclose.
The standard’s definitions name two common types: a shadow price, a theoretical cost used to inform decisions, and an internal fee or tax charged to business activities.
A planning tool that tests projects under several carbon prices helps with the first limb only if it records which price was actually used in which decision.
The builder beside this text drafts both limbs from your answers; the figure you enter is yours, and nothing here suggests a price.
The disclosure sits in the metrics and targets pillar, which is set out on IFRS S2.
The UK regimes
SINAI against SECR, UK SRS and the other regimes it is searched for
The left-hand columns are the law and the vendor’s own words.
The right-hand column is the request that turns one into evidence about the other.
Nothing here is a finding about the product.
Module 01 / 04
UK SRS S2 ¶29(f)
Module 02 / 04
UK SRS S2 ¶29(a)
Module 03 / 04
SECR
Module 04 / 04
IFRS / ISSB, CSRD, CDP
Read the detailed guidance and evidence
| Regime | What the rule requires | What SINAI says | Ask to see |
|---|---|---|---|
| UK SRS S2 ¶29(f) | Whether and how a carbon price is applied in decisions, and the price per tonne used (¶29(f)) | Carbon pricing to test project economics under different assumptions; NPV, CAPEX and OPEX beside abatement (SINAI Reduce) | A record of which decisions used the price, and the price itself, exportable for the disclosure |
| UK SRS S2 ¶29(a) | Gross Scopes 1–3 to the GHG Protocol; location-based Scope 2; the Scope 3 category record (¶29(a); ¶¶B30–B33) | “Audit-grade” Scope 1–3 accounting; 100,000+ emission factors; supplier-specific emissions for 4 million companies (sinai.com) | The Scope 2 default and a category-by-category Scope 3 inclusion record |
| SECR | kWh, statutory emissions limbs, an intensity ratio, methodology and comparatives (Sch 7) | Not named on the pages read | A directors’ report SECR section for a UK entity |
| IFRS / ISSB, CSRD, CDP | UK SRS is IFRS S1 and S2 with UK amendments; the CSRD needs the FY2026 version statement (DR 2026/1563) | Reports for CSRD, CBAM, SEC, IFRS/ISSB and CDP (sinai.com); also GRI and California SB 253 and 261 (sinaitechnologies.com) | A UK SRS S2 output, and the ESRS version field for 2026 |
| CBAM | The EU CBAM; the separate UK CBAM from 1 January 2027 (Finance Act 2026 Part 5) | Names CBAM among the regulations it supports | Which CBAM — EU or UK — and for which goods |
SECR is not named on the SINAI pages read; the government’s SECR guidance sets out what a directors’ report must contain.
UK SRS is available for voluntary use by any entity (DBT guidance), and listed companies in scope of the FCA rules report against it on a comply-or-explain basis from 2027.
SINAI names CBAM; the UK’s own CBAM, set by Part 5 of the Finance Act 2026, commences on 1 January 2027 and is a separate regime from the EU’s.
SINAI also names CDP.
Audit trail
Assurance readiness: what can be checked, and by whom
Module 01 / 04
Evidence
Module 02 / 04
Assurance
Module 03 / 04
Listed categories
Module 04 / 04
Assurance · 2
Read the detailed guidance and evidence
SINAI describes full data lineage, audit trails and an evidence trail behind every number.
Its site also makes claims about third-party verification and analyst recognition; this page does not repeat them, because a vendor’s claim about a third party is best checked at that third party’s own page.
The FCA’s UK SRS listing rules do not themselves require third-party assurance; listed companies in scope state whether they obtained it, from whom and to which standard.
For the ¶29(f) disclosure specifically, the evidence an assurer would look for is the decision record: which investment or transfer-pricing decisions used a carbon price, and at what level.
What UK assurance involves is on UK SRS assurance.
Price
SINAI pricing: what the vendor publishes
Module 01 / 04
Price evidence
Module 02 / 04
Key point 02
Module 03 / 04
Key point 03
Module 04 / 04
Key point 04
Read the detailed guidance and evidence
SINAI publishes no price on sinai.com or sinaitechnologies.com; both invite you to talk to the company or tour the platform.
This site records that as Enterprise level · TBD.
Searches for SINAI’s pricing often ask for an annual contract value; no such figure is published by SINAI, and we do not estimate one.
Because SINAI sells modules separately as well as together, a quote can be scoped to accounting only, planning only, or both.
In the demonstration
Questions to put to SINAI, each tied to a provision
Module 01 / 04
Disclosure
Module 02 / 04
Key point 02
Module 04 / 04
Key point 04
Questions for SINAI · 13 requests
- Show the year’s kWh total and the lines it is built from, split by fuel.SECR · SI 2008/410 Sch 7 ¶15(3A); ¶20D(3) ↗
- Map each calculation line to the statutory limb it reports under.SECR · Sch 7 ¶15(2)–(3); ¶20D(1)–(2) ↗
- Let us set our own denominator, and show the ratio uses emissions, not energy.SECR · Sch 7 ¶17; ¶20G ↗
- Export the methodology statement, naming the factor set and approach used.SECR · Sch 7 ¶16; ¶20F ↗
- Reproduce last year’s energy and emissions beside this year’s from stored data.SECR · Sch 7 ¶18, ¶18A; ¶20H ↗
- Keep a log of measures that feeds the narrative.SECR · Sch 7 ¶15(3D); ¶20D(4) ↗
- Show the relief test running on every energy product, and the statement it produces.SECR · Sch 7 ¶15(5)(a); ¶20D(7)(a); ¶20, ¶20K ↗
- Show which factor set was applied to each activity line, and the rule for periods spanning two years.Conversion factors · DESNZ 2026 Methodology Paper ¶1.10 ↗
- Does the year-on-year view annotate the 2026 methodology change?Conversion factors · Methodology Paper ¶1.13; 2026 major changes report ↗
- Show the measurement approach and organisational boundary the engine applies.UK SRS S2 · UK SRS S2 ¶29(a)(ii) ↗
- Show that credits sit in a separate ledger and never reduce the reported total.UK SRS S2 · UK SRS S2 ¶29(a)(i) ↗
- Default Scope 2 to location-based, with market-based alongside if we choose.UK SRS S2 · UK SRS S2 ¶29(a)(v); ¶¶B30–B31 ↗
- Show a category-by-category record of what is included and why the rest is not.UK SRS S2 · UK SRS S2 ¶¶B32–B33; ¶29A ↗
Your record of your own demonstration — not an assessment of any product.
Nothing you mark leaves your browser.
Read the detailed guidance and evidence
Add one request to the list the builder produces: ask SINAI to show the record that would support a ¶29(f) disclosure — the decisions that used a carbon price and the price used.
The builder beside this text lists the other requests for the regimes you choose, each with its provision.
The full register is on sustainability software.
Everything above describes what SINAI publishes about itself, set beside what the rules require.
We have not trialled the product, taken a briefing or accepted any fee, and we rank no vendor above another.
Also in the directory
Other vendors described the same way
Module 01 / 03
Key point 01
Module 02 / 03
Key point 02
Module 03 / 03
Key point 03
Read the detailed guidance and evidence
These profiles are built on the same pattern: the vendor’s own words, set against the same requirements.
Listing them is not a recommendation, and they are in no order of merit.
- Sphera — operational risk and sustainability software with life-cycle assessment.
- Workiva — a reporting platform that connects carbon and financial data.
- Watershed — an enterprise platform for emissions measurement and disclosure.
All seventeen are described side by side, alphabetically, on carbon management software, with the requirements every tool is measured against.
Frequently asked
Questions people ask
What is SINAI Technologies?
SINAI describes itself as enterprise carbon management software that joins Scope 1–3 accounting to decarbonisation planning.
Its site, read on 1 October 2026, describes four parts — Measure, Engage, Report and Reduce — and financial modelling of reduction projects alongside their emissions effect.
Does SINAI have an internal carbon pricing module?
SINAI’s pages describe carbon pricing used to test project economics under different price assumptions, showing how a price changes NPV, marginal abatement cost and capital allocation.
Its site also has a page on internal carbon pricing.
Under UK SRS S2 ¶29(f), an entity discloses whether and how it applies a carbon price in decision-making and the price per tonne it uses; the builder on this page drafts that disclosure.
What are marginal abatement cost curves in SINAI?
SINAI describes dynamic marginal abatement cost (MAC) curves that rank reduction projects by cost per tonne abated, with scenario modelling and forecasts against SBTi or net-zero targets.
A MAC curve is a planning tool; no UK disclosure standard requires one, though UK SRS S2 asks about transition plans, targets and capital deployment.
How much does SINAI cost?
SINAI publishes no price on either of its websites; its pages invite you to talk to the company. This site records that as Enterprise level · TBD.
Annual contract values quoted elsewhere are not SINAI’s own published figures.
Does SINAI support SECR in the UK?
SECR is not named on the SINAI pages read.
Ask to see a Schedule 7 section for a UK entity: the kWh total, each statutory emissions limb, an intensity ratio, the methodology statement and comparatives.
Does SINAI cover Scope 1, 2 and 3?
SINAI says it provides audit-grade Scope 1–3 accounting with more than 100,000 emission factors and supplier-specific emissions for over 4 million companies.
UK SRS S2 requires location-based Scope 2 and a record of which Scope 3 categories are included.
Why does SINAI have two websites?
The company operates sinaitechnologies.com and sinai.com, both titled as its enterprise carbon management and sustainability platform.
They describe the same company’s products in different ways; this profile cites each for what it says.
Has this site tested SINAI?
No. This page describes what SINAI publishes about itself and sets it beside what the rules require. It gives no rating.
Prepare the evidence
Sinai carbon accounting software: from a requirement to a reporting pack
Use this preparation sequence alongside the detailed requirements on this page.
An editorial workflow, not a statutory schedule.
- Stage 0101
Reporting specification
Write the reporting boundaries and required outputs before evaluating a platform.
- Stage 0202
Evidence sample
Ask the vendor to demonstrate a representative import and calculation.
- Stage 0303
Method control
Inspect factor versions, estimates, permissions and change history.
- Stage 0404
Reporting export
Test the export against the required disclosures and existing reporting systems.
- Stage 0505
Review trail
Check whether a reviewer can follow a result back to its source record.
- Stage 0606
Commercial record
Record only the features, scope and prices the vendor actually commits to.
Read the applicable instrument: SINAI — enterprise carbon management and sustainability platform (sinai.com)
A practical brief
An evidence pack, with a clear review trail
Ask for a pack that lets the next reviewer retrace the scope decision, follow the evidence and understand the limitations.
This describes a useful handover; it does not certify compliance or establish that a vendor or adviser delivers it.
Module 01 / 04
Applicability record
Write down the entity, reporting route and relevant period, including why the route applies.
Module 02 / 04
Evidence register
Attach each reported figure or statement to its source, method, version and limitations.
Module 03 / 04
Review trail
Name the preparer, reviewer, open questions and decisions taken before publication.
Module 04 / 04
Usable handover
Retain the working files and unresolved actions so the next reporting cycle can reuse the evidence.
View the preparation diagram
- Prepare01
Create the traceable pack
Keep the input records, calculation files and narrative together.
- Challenge02
Resolve questions before publication
Record the assumptions challenged and any limitations still unresolved.
- Retain03
Make the next cycle reproducible
Keep the approved version and the actions carried forward.
Continue your research
Related guides, one question at a time
Sources
Primary sources
Every figure, date and status on this page traces to the instrument’s owner.
Secondary commentary is never the source for a number.
- SINAISINAI — enterprise carbon management and sustainability platform (sinai.com)
SINAI’s own description of Measure, Engage, Report and Reduce. A product reference, not evidence.
- SINAISINAI Technologies (sinaitechnologies.com)
The same company’s other domain, listing its modules and the regulations it names.
- SINAISINAI Reduce — decarbonisation planning
MACC curves, scenario modelling and carbon-price sensitivity.
- SINAIInternal carbon pricing
SINAI’s description of project tracking with financial and emissions impact.
- Department for Business and TradeUK SRS S2 Climate-related Disclosures, ¶29(a) and ¶29(f)
Gross emissions; the internal carbon price disclosure.
- IFRS FoundationIFRS S2 Climate-related Disclosures (December 2025 text), ¶29(f)
The identical internal-carbon-price paragraph in the international standard.
- Department for Business and TradeUK Sustainability Reporting Standards — guidance
UK SRS available for voluntary use.
- Financial Conduct AuthorityPS26/19 — UK SRS on a comply-or-explain basis
Listed companies, periods from 1 January 2027.
- legislation.gov.ukSI 2008/410 Schedule 7 — SECR
The statutory SECR content.
- Department for Business and TradeEnvironmental reporting guidelines, including SECR guidance
The government’s SECR guidance.
- legislation.gov.ukFinance Act 2026, Part 5 — the UK CBAM
The UK charge, from 1 January 2027.
- GHG ProtocolCorporate Accounting and Reporting Standard
The measurement basis UK SRS S2 names.
- Science Based Targets initiativeScience Based Targets initiative
The target framework SINAI names.
- Science Based Targets initiativeStandards and guidance
V1.3.1 for targets set in 2026; V2.0 validation from early 2027.
- CDPCDP disclosure platform
A framework SINAI names.
Continue reading